Machinery / GR-CLK450-SF4

GR-CLK450-SF4 · Full servo

Adult pull-up diaper line.

Full-servo converting for adult pull-up diapers, with product-specific size settings and optional automatic stacking.

Stable reference
400pcs/min
Design speed
450pcs/min
Installed capacity
≈468kW

Technical reference

The details behind the line.

Use these figures for initial planning. We review the product, materials, workshop and downstream equipment before preparing a project-specific proposal.

Design speed
450 pcs/min
Stable production reference
400 pcs/min
Product size reference
M / L / XL
Installed capacity
Approx. 468 kWIncluding glue equipment
Machine envelope (L × W × H)
42 × 9 × 5 mExcluding packaging equipment
Machine weight
Approx. 90 t
Power supply reference
380 V / 50 Hz
Control platform
Full-servo drive, PLC and HMI
Absorbent core
Fluff pulp with SAP
Data sheet
Download CSV

Reference speeds are not a guarantee for every product. Final performance and trial conditions are agreed in the technical specification. Installed capacity is not measured running consumption; allow additional space for access, materials and ancillary systems.

Process overview

From raw materials to finished product.

The main stages of the reference configuration. Modules and options are confirmed for your product.

01

Pulp crushing & SAP feeding

02

Core and material lamination

03

Elastic waistband & leg cuffs

04

Cutting, rejection & folding

Configuration & options

Automatic stacking; product-specific tooling and downstream packing interfaces. Size adjustment and changeover scope are confirmed against approved product samples; digital settings do not remove every tooling or material change.

Adult pull-up diaper line
GR-CLK450-SF4 · reference line

Ask the floor

Want to see something on this line?

Tell us which module, changeover or layout question matters to you. We check with the manufacturer what can be filmed or visited, and send you what we find.

From first brief to delivery

Agree the details at every stage.

01

Define & configure

Confirm the finished product, production target, layout and equipment scope.

02

Review & test

Agree trial materials, inspection criteria and the factory acceptance process.

03

Deliver & support

Confirm shipping, installation, training, spare parts and manufacturer support arrangements in the project documents.

Send us your sample or drawing. We'll check the fit.

Start on WhatsApp