GR-JQK450-SF4 / FULL SERVO

Menstrual pants line.

Full-servo converting for menstrual, overnight and maternity-care pants. Each product is configured and approved separately.

Discuss this line ↗
Menstrual pants line reference configurationEquipment reference · configuration varies by project
390–420pcs/min · stable reference
450pcs/min · design speed
480 kWapprox. installed capacity

TECHNICAL REFERENCE

The details
behind the line.

Use these figures for initial planning. We review the product, materials, workshop and downstream equipment before preparing a project-specific proposal.

Download specifications ↓
Design speed450 pcs/min
Stable production reference390–420 pcs/min
Product size referenceM / L / XL
Installed capacityApprox. 480 kW, including glue equipment
Machine envelope (L × W × H)47 × 9 × 5 m, excluding packaging equipment
Machine weightApprox. 98 t
Power supply reference380 V / 50 Hz
Control platformFull-servo drive, PLC and HMI
Absorbent coreFluff pulp with SAP

Reference speeds are not a guarantee for every product. Final performance and trial conditions are agreed in the technical specification. Installed capacity is not measured running consumption; allow additional space for access, materials and ancillary systems.

PROCESS OVERVIEW

From raw materials to finished product.

01

Nonwoven lamination & core formation

02

SAP feeding

03

Elastic waistband & cuff forming

04

Cutting, rejection & folding

Configuration & options

Automatic stacking; adult pull-up compatibility subject to product, tooling and trial confirmation. Size adjustment and changeover scope are confirmed against approved product samples; digital settings do not remove every tooling or material change.

FROM FIRST BRIEF TO DELIVERY

Agree the details at every stage.

01

Define & configure

Confirm the finished product, production target, layout and equipment scope.

02

Review & test

Agree trial materials, inspection criteria and the factory acceptance process.

03

Deliver & support

Confirm shipping, installation, training, spare parts and manufacturer support arrangements in the project documents.

YOUR NEXT STEP

Tell us what you want to make.
Or what you want to source.

Talk to us ↗