THE MACHINERY COLLECTION

Your product.
Your production line.

Four reference configurations. A technical proposal shaped around
your product, your output and your available space.

Adult pull-up diaper line equipment referenceFULL SERVO

GR-CLK450-SF4

Adult pull-up diaper line

Full-servo converting for adult pull-up diapers, with product-specific size settings and optional automatic stacking.

400 pcs/minReference stable output↗
Underpad & pet pad line equipment referenceFULL SERVO

GR-CD350-SF

Underpad & pet pad line

A configurable line for underpads, maternity pads and pet training pads, with a range of product dimensions.

300–320 pcs/minReference stable output↗
Tape-on adult diaper line equipment referenceFULL SERVO

GR-CK300-SF

Tape-on adult diaper line

Full-servo production for tape-on adult diapers, configured around the approved core structure, fit and fastening system.

260–280 pcs/minReference stable output↗
Menstrual pants line equipment referenceFULL SERVO

GR-JQK450-SF4

Menstrual pants line

Full-servo converting for menstrual, overnight and maternity-care pants. Each product is configured and approved separately.

390–420 pcs/minReference stable output↗

AT A GLANCE

Compare the essentials.

Download reference data ↓

On smaller screens, scroll the table sideways to compare all columns.

Machinery reference specifications
Line / modelDesign
pcs/min
Stable reference
pcs/min
Installed
capacity
Machine envelope
L × W × H
GR-CLK450-SF4 ↗450400≈ 468 kW42 × 9 × 5 m
GR-CD350-SF ↗350300–320≈ 270 kW30 × 6.5 × 3.7 m
GR-CK300-SF ↗300260–280≈ 450 kW37 × 9 × 5.5 m
GR-JQK450-SF4 ↗450390–420≈ 480 kW47 × 9 × 5 m

Installed capacity includes glue equipment and is not actual operating energy consumption. Machine dimensions exclude packaging equipment. Reference speeds are configuration-dependent; confirm product-specific targets and acceptance conditions before ordering.

A BETTER BRIEF, A MORE USEFUL PROPOSAL

Six details to start with.

01

Your product

Product type, sizes and a reference sample or drawing.

02

Your output

Target pieces per minute and planned operating shifts.

03

Your space

Workshop length, width, clear height and access.

04

Your utilities

Voltage, frequency and available compressed air.

05

Your packaging

Manual packing, automatic stacking or downstream integration.

06

Your timeline

Your target date for production and project milestones.

PLANNING A LINE

Questions worth
asking early.

How do I choose between a pull-up and a tape-on diaper line?

Start with the finished product. Pull-up and tape-on products use different waist and fastening structures. Send a reference sample or drawing so the appropriate line and modules can be reviewed.

Is design speed the same as production output?

No. Design speed is a machine reference. Sustainable output depends on the agreed product size, materials, configuration and quality criteria. Confirm the operating target and trial conditions in the technical agreement.

What changes when I change product size?

HMI recipe adjustment is one part of changeover. Material widths, threading, tooling and downstream settings may also change. The required work should be confirmed for your selected products.

What should I prepare for the workshop layout?

Share usable length, width and clear height, access routes, power supply and available utilities. A machine envelope alone does not include all storage, service clearances or auxiliary equipment.

How are testing, installation and training arranged?

We coordinate these arrangements with the equipment manufacturer. Trial materials, acceptance criteria, responsibilities, travel costs and training scope are agreed for each project.

YOUR NEXT STEP

Tell us what you want to make.
Or what you want to source.

Talk to us ↗